Project Lab Psychrometric

| Nama Project | Research & Development of Test Equipment |
| Lokasi | PT Panasonic Manufacturing Indonesia – Jakarta |
| Tahun | 2024 |
| Cakupan Pekerjaan | Installation of Psychometric Measuring instruments System for Water Package Air Conditioner |
Project Minyak & Gas Bumi

| Nama Project | VR – A and VR – B Duct Inspection |
| Lokasi | LNG Tangguh – Sorong, Papua |
| Tahun | 2019 |
| Scope of Work | Inspection & Engineering Consultant |
| AC System | Rooftop |
| Qty | 2 Package HVAC Duct Unit |

| Nama Project | VR – B HVAC Duct & System Upgrades |
| Lokasi | LNG Tangguh – Sorong, Papua |
| Tahun | 2021 |
| Cakupan Pekerjaan | Supply units & Installation |
| AC System | Rooftop |
| Qty | 1 unit HVAC Package |

| Nama Project | VR – A and VR – B Duct Inspection |
| Lokasi | LNG Tangguh – Sorong, Papua |
| Tahun | 2019 |
| Cakupan Pekerjaan | Inspection & Engineering Consultant |
| AC System | Rooftop |
| Qty | 2 Package HVAC Duct Unit |

| Nama Project | HVAC System of OCMR Building |
| Lokasi | RU VII Kasim – Sorong, Papua Barat |
| Tahun | 2024 |
| Cakupan Pekerjaan | Supply units & Installation |
| AC System | DX Unit – Air Handling Unit (AHU) |
| Qty | 2 unit AC Package complete with all System |
| TTL Capacity | 2 x 560,000 Btu |

| Nama Project | CUCL Project – PT. Freeport Indonesia. |
| Lokasi | Mimika-Papua |
| Tahun | 2024 |
| Cakupan Pekerjaan | Supply Material & Installation |
| AC System | VRF Mitsubishi |
| Qty | Package HVAC Duct Unit |
Project Pemerintah

| Nama Project | Replacement & Maintenance |
| Lokasi | Kantor Bupati Merauke |
| Tahun | 2022 |
| Cakupan Pekerjaan | Supply & Maintenance Ducting System |
| AC System | Water Package Air Conditioner Mitsubishi |
| Qty | 1 set |
| TTL Capacity | 20 PK |

| Nama Project | VIP Room Walikota Sorong |
| Lokasi | Kantor Walikota Sorong, Papua |
| Tahun | 2020 |
| Cakupan Pekerjaan | Supply units & installation |
| AC System | Split Duct + Ceiling Suspended Floor Standing + Cassette + Split Wall |
| Qty | 24 Units |
Project Manufaktur

| Nama Project | WPAC Supply Unit |
| Lokasi | PT. Panasonic Industrial Component Indonesia |
| Tahun | 2022 |
| Cakupan Pekerjaan | Supply Unit WPAC |
| AC System | Water Package Air Conditioner Daikin |
| Qty | 1 set |
| TTL Capacity | 20 PK |

| Nama Project | Ducting Replacement Unit |
| Lokasi | PT. Panasonic Gobel Life Solutions Manufacturing Indonesia |
| Tahun | 2022 |
| Cakupan Pekerjaan | Supply Unit WPAC |
| AC System | Water Package Air Conditioner Daikin |
| Qty | 3 set |
| TTL Capacity | 20 PK |
Project Gedung Bertingkat dan Perkantoran

| Nama Project | TCC Telkomsel |
| Lokasi | Telkom Regional II |
| Tahun | 2022 |
| Cakupan Pekerjaan | Supply units & Installation |
| AC System | Single Split Wall Mounted |
| Qty | 26 set |
| TTL Capacity | 130 HP |

| Nama Project | Telkom Office |
| Lokasi | Indonesia-Nationwide |
| Tahun | 2017 & 2019 |
| Cakupan Pekerjaan | Supply units & Installation |
| AC System | Single Split Wall Mounted & Floor Standing |
| Qty | 619 set |
| TTL Capacity | 1293 HP |

| Nama Project | VRV System Installation for Residential |
| Lokasi | Kemang – Jakarta Selatan |
| Tahun | 2024 |
| Cakupan Pekerjaan | Supply units & Installation |
| AC System | VRV Split Duct & Wall Mounted |
| Qty | 22 sets |
| TTL Capacity | 72 HP |

| Nama Project | Sucoffindo Office |
| Lokasi | PT. Sucofindo (Persero)-Bekasi |
| Tahun | 2019 |
| Cakupan Pekerjaan | Installation |
| AC System | Single Split Cassette |
| Qty | 5 sets |
| TTL Capacity | 25 HP |
Project Hotel

| Nama Project | All AC Replacement |
| Lokasi | Hotel Salak Padjadjaran – Bogor |
| Tahun | 2019 |
| Cakupan Pekerjaan | Consultation, Supply units & Installation |
| AC System | Single Split Wall Mounted & Cassette |
| Qty | 146 sets |
| TTL Capacity | 184 HP |

| Nama Project | AC Replacement |
| Lokasi | Hotel Aston BNR – Bogor |
| Tahun | 2019 |
| Cakupan Pekerjaan | Installation |
| AC System | Single Split Ducted |
| Qty | 4 sets |
| TTL Capacity | 12 HP |

| Nama Project | AC Replacement |
| Lokasi | Fave Hotel by Aston – Bogor |
| Tahun | 2019 |
| Cakupan Pekerjaan | Supply Units & Installation |
| AC System | Single Split Wall Mounted |
| Qty | 63 sets |
| TTL Capacity | 71 HP |

| Nama Project | Hotel Aimas VRV |
| Lokasi | Hotel Aimas – Sorong, Papua |
| Tahun | 2019 |
| Cakupan Pekerjaan | Supply units & Installation |
| AC System | VRV (2 OU + 13IU)+ Floor Standing 5HP + Split Wall Mounted 2HP |
| Qty | 456 Units |
| TTL Capacity | 1100 HP |
Project Rumah Sakit dan Restoran

| Nama Project | Emergency Room |
| Lokasi | RS Permata Cibubur |
| Tahun | 2020 |
| Cakupan Pekerjaan | Supply units |
| AC System | Air Purifier |
| Qty | 5 Sets |

| Nama Project | Sushi Sei AC |
| Lokasi | Sushi Sei Plaza Senayan – Jakarta |
| Tahun | 2022 |
| Cakupan Pekerjaan | Supply units & Installation |
| AC System | Single Split Wall Mounted & Floor Standing |
| Qty | 6 Units |
| TTL Capacity | 30 HP |
Project Gedung Sekolah

| Nama Project | Mazaya Assunnah Islamic Boarding School |
| Lokasi | Mazaya Assunnah Islamic Boarding School – Depok |
| Tahun | 2020 |
| Cakupan Pekerjaan | Supply units & Installation |
| AC System | Single Split Wall Mounted |
| Qty | 36 Sets |
| TTL Capacity | 65 HP |

| Nama Project | Ibnu Hajar Boarding School |
| Lokasi | Ibnu Hajar Boarding School- Depok |
| Tahun | 2018 |
| Cakupan Pekerjaan | Supply units & Installation |
| AC System | VRV |
| Qty | Outdoor = 6 Unit ; Indoor – 59 Unit |
| TTL Capacity | 112HP (4 System) |
Data Center

| Nama Project | Relokasi Unit Outdoor dan Pemasangan AC VRV |
| Lokasi | Data Center Tier IV Facility. |
| Tahun | 2025 |
| Cakupan Pekerjaan | Instalasi dan Relokasi |
| AC System | VRV |